Second Vivekanand Bridge Tollway Project

The Second Vivekananda Bridge Tollway Project includes an 880m cable-stayed bridge with six-lane approaches. This bridge is unique in India, supported by a single set of cables along the central median. Encardio-rite provided instrumentation for the project, ensuring real-time monitoring of the bridge’s structural integrity. The project, handled by SVBTC and NHAI, was contracted by L&T ECC.

Second Vivekanand Bridge Tollway Project

This project includes an 880 m long and 31.1 m wide cable-stayed bridge and six-lane approaches on both sides with ramps. The Second Vivekananda Bridge is the first of its kind in the country, as there is only one set of cables holding the 880m bridge up along the central median.

Instrumentation for the project is done by Encardio Rite. The project is under the SVBTC (Second Vivekananda Bridge Tollway Company Pvt. Ltd.) & NHAI (National Highway Authority of India). The contractors for the project are L & T ECC.

Project DetailsSecond Vivekanand Bridge Tollway Project
LocationKolkata, India
ClientSVBTC & NHAI
ContractorL & T ECC

Direct To Your Inbox !

Subscribe to our monthly newsletter and get access to the latest industry trends, insights & updates.