Chiraiyatand Bridge

Chiraiyatand Bridge: A Pioneering 4-Lane Cable-Stayed Over Bridge in Bihar Utilizing German Technology and Advanced Monitoring Systems, Built with 42 High-Quality Cables and Featuring a Computerized Load Management System to Ensure Safety and Durability for Increasing Traffic Demands.

Chiraiyatand Bridge

The 4-lane cable-stayed over the bridge is the second of its kind in the country, built with German technology jointly by the Bihar State Bridge Construction Corporation and IRCON. While 42 cables were utilized for the overbridge, 22 cables were used to complete two bridge lanes. The cables used by the railways were imported from Germany and quality-tested in Switzerland. The functioning of the overbridge is monitored through a computerized system. While it was decided that 45% of the load would be put on the cables in the beginning for easy traffic movement on the bridge, the railways are to reserve the remaining 55% of load capacity to meet any emergency due to the increasing traffic load. The overbridge was built with a special system to protect the cables, particularly from the sun, water, and rust. The total project expenditure cost more than INR 74 crore. The project is a joint venture of the railways and the state government.

Encardio-rite was awarded the complete instrumentation order for the project.

Project DetailsChiraiyatand Bridge
LocationPatna
DesignCable-stayed Bridge; 110 m long and 20 m wide
ClientBihar State Bridge Construction Corporation
ContractorIRCON