One Za’abeel Towers
This development comprises two towers—a 305 m high Tower A and a 240 m high Tower B—with commercial and residential spaces. The Towers are being constructed on either side of the Al Saa’da Road Bridge, which passes through the center of the plot. The automatic online monitoring method was adopted, taking into consideration the criticality of safety monitoring of the Al Saa’da Bridge.
Moreover, the six-level basement car parking required excavation to depths ranging from 23.8 m to 25 m below ground level. Additionally, the basements were connected by two tunnels underneath the existing elevated road that bisects the two towers. This again required monitoring work.
Thus, monitoring work was divided into three sections
Encardio Rite won the subcontract for the monitoring work, which included monitoring the pre-construction condition of the Al Saa’da Bridge, supply, installation, manual and automatic monitoring, and surveying. Instruments used included a strain gage, prism targets, and temperature sensors for monitoring the bridge and the pier. Inclinometers, piezometers, and prism targets were used for monitoring the excavation work.
Online monitoring was done for critical geotechnical sensors using advanced automatic data loggers and data acquisition systems. Prism targets installed on piers were monitored using 3 automatic total stations and complex control boxes with a 20-minute monitoring frequency. All the monitored data (automatic and manual) was available online through our web-based data management system for the Contractor, Client, and Consultants.
Project Details | One Za’abeel Towers |
Location | Dubai, UAE |
Consultant | W.S.P |
Client | Investment Corporation of Dubai |
Contractor | APCC Piling and Contracting L.L.C |