Stonecutter Bridge
The project formed part of Highways Department Route 9, and this section comprised the Stonecutters Bridge linking Stonecutters Island and Tsing Yi. Tysan's scope was to construct a bored pile foundation for the bridge East and West Towers and approach piers consisting of 18 number of 2.0 m dia., 34 number of 2.5 m dia. and 56 numbers 2.8 m dia. bored piles ranging in depth from 50 m to over 100 m (due to presence of fault zone at West Tower, a few piles required to be driven up to 100 m below existing ground level). 42 numbers of 2.0 m dia. bored piles were also provided to support the bridge decks' false-works.
Encardio-rite supplied geotechnical monitoring instruments for the project. Our marketing associate in Hong Kong supplied the instrumentation, which included mostly digital inclinometers to monitor the lateral movement of the piles.
| Project Details | Stonecutter Bridge |
|---|
| Location | Hong Kong |
| Client | Tysan Foundation Geotechnical Limited |
| Year | 2019 |