Deira Waterfront Development Plot-11B (Phase-01)
The Deira Waterfront project is part of the Deira Enrichment Project (DEP), a plan to develop Deira and expand its footprint towards the sea. The DEP Masterplan seeks to retain Deira’s traditions and cultures and incorporate them in the revitalization of the waterfront area, known as the Deira Waterfront. The Waterfront area is located in the northern portion of the Deira District across the street from the old souks along the creek.
Plot-11B of Phase 1 consisted of retail and hotel development construction. The plot was located parallel to the Dubai Metro Green Line Tunnel—the face of the building was just 8.2 m from the Dubai Metro Tunnel. The excavation depth varied from 2.5 m to 6 m below the ground level. Thus, safety instrumentation and monitoring of the metro tunnel and the shoring works became critical during and after the construction activities.
The purpose of the monitoring instrumentation was to study metro tunnels' response to the loads and surcharges imposed during construction and to ensure that the responses were within design predictions. The monitoring data also provides early warning through regular or continuous monitoring for excessive and undue ground movements.
Encardio-rite’s sister concern, Encardio-rite Geosystems LLC in UAE, was awarded an I&M sub-contract for the turnkey monitoring solutions that included:
- Pre-construction building condition survey of the buildings adjacent to the tunnel and construction area
- Supply, installation, and monitoring of geotechnical instruments inside the tunnel to monitor the response of the loads and surcharges imposed by the construction activities; for shoring works
- Establishment, measurements, and maintenance of survey network
- Setting up a convergence monitoring system inside the tunnel using robotic total stations & control boxes
- Manual and automatic monitoring
- Weekly & monthly reporting with evaluation & Interpretation
Geotechnical instruments used for monitoring and surveying during construction activity included piezometers, inclinometers, strain gages, standpipes, borehole extensometers, tunnel displacement gages, crack mater, tilt beam sensors (track monitoring), tri-axial accelerometers (vibration monitoring), settlement points and prism targets. Dataloggers were used to collect and transmit data from the geotechnical sensors automatically. Robotic total stations automatically collected and transmitted data from prism targets.
Project Details | Deira Waterfront Development Plot-11B (Phase-01) |
---|
Location | Dubai, UAE |
Client | Investment Corporation of Dubai |
Contractor | Dubai Civil Engineering L.L.C. |
Consultants | AE7 |
Duration | 2019-2021 |