Stockholm Metro Extension Project

The Stockholm Metro Extension in Sweden expands the Blue Line with 20 km of new track and 11 stations, including underground stretches from Kungsträdgården to Nacka and Södermalm. Encardio Rite, through its regional marketing associate, provided geotechnical instruments, including inclinometers and piezometers, for hydrogeological monitoring during pre-works. These instruments ensure ground stability and safety for the new sections, particularly the underground 4 km extension to Barkarby and Barkarbystaden stations, supporting Stockholm’s growing metro infrastructure and urban connectivity.

Stockholm Metro Extension Project

Stockholm's metro rail network in Sweden is being expanded with 20 km of new tracks and 11 new stations in four regional sections. The metro link expanded below ground by 11.3 km from Kungsträdgården to Nacka, Södermalm and Söderort. A new tunnel was planned from Kungsträdgården to Gullmarsplan via Sofia on Södermalm. 

The blue line was extended by approximately 4 km below ground from Akalla to Barkarby via Barkarbystaden. The stretch had two new stations, Barkarbystaden and Barkarby.

Monitoring Scope: 

Hydrogeological investigation for Stockholm Metro Extension - Blue Line. The instrumentation was required for pre-works

Encardio-rite supplied the geotechnical instruments through marketing associates in the region. 

Geotechnical instruments supplied, including inclinometers and piezometers.

Project DetailsStockholm Metro Extension Project
LocationStockholm, Sweden
OperatorStockholm County Council
Duration2018