Seymour Street Office Renovation

Rite Geosystems successfully monitored the structural integrity of a 100-year-old Seymour Street office building during a complex renovation, utilizing advanced wireless instrumentation to track settlement and movement during elevator pit installation in the USA.

Seymour Street Office Renovation

A two-story masonry structure that was over 100 years old underwent renovation and expansion to offer more office space. One aspect of the modification was building an elevator pit for a new elevator in the constrained internal area of the current building footprint. A brick and concrete block external wall, as well as pre-existing beam footings supporting the second-floor frame, were all nearby when the elevator pit was dug.

Rite Geosystems Inc., USA was entrusted with providing automated instrumentation for the project with real-time monitoring results to detect settlement of the existing support column footings and movement of the existing perimeter wall during underpinning excavation of the existing masonry wall and elevator pit.

The instrumentation installed at this site included wireless tilt meters, beam sensors, and vibrating wire strain gauges. In addition to automated instrumentation, settlement pins were installed for survey monitoring of the wall and beam footings.

Direct To Your Inbox !

Subscribe to our monthly newsletter and get access to the latest industry trends, insights & updates.