North-South Corridor Contract N102
Instrumentation and monitoring for the 21.5 km North-South Corridor of the underground highway section was required for risk assessment. The corridor connects Marina Bay in the southern part and the northernmost Woodland area in Singapore. It is being built as an underground highway between two metropolitan subway lines (DTL and NEL). The project includes constructing two-way six lanes of cut & cover underground tunnel 1.42 km with four entry/exit slip roads. Section N102 is considered the most challenging section because the location for this section of the underground expressway is crisscrossed by roads on the ground and two subway lines (DTL and NEL) underground. Notably, the two-way, six-lane expressway will be constructed just one meter above the NEL Line.
Encardio-rite supplied around 220 piezometers for the project through a regional marketing associate.
All piezometers (100%) are operating satisfactorily until today.
Project Details | North-South Corridor Contract N102 |
---|
Location | Singapore |
Client | Land Transport Authority (LTA) in Singapore |
Contractor | Ssangyong E&C |
Year | 2019-till date (2021) |