Nikachhu Hydropower Project

Encardio Rite was awarded the instrumentation and monitoring work for Bhutan’s Nikachhu Hydropower Project. This included the 38 m high concrete gravity dam, a 12.1 km head race tunnel, and a powerhouse with two Pelton turbines generating 118 MW. Encardio Rite supplied and installed hundreds of geotechnical sensors such as piezometers, uplift pressure cells, inclinometers, load cells, and more. An automatic data acquisition system was used for real-time data collection, and the company provided regular monitoring reports with detailed analysis of construction progress and instrument data.

Nikachhu Hydropower Project

Nikachhu Hydropower Project is a run-of-the-river project located between the junction of Nikachhu/Chhunabchhu and Nikachhu/Mangdechhu in Trongsa District, Bhutan. It is located almost 3 km from Chhunabchhu junction downstream. 

Dam: 38 m high concrete gravity dam

Head Race Tunnel (HRT) : Diameter 4 m ; Length 12,144 m

PowerHouse: Design discharge hits two Pelton turbines with a capacity of 118 MW. The water is then discharged into the reservoir of Mangdechhu Hydropower Project

The complete instrumentation & monitoring work for the Dam, Power House, and Head race tunnel project was awarded to Encardio-rite. The scope of work included:

  • Supply of all instruments
  • Installation & monitoring of geotechnical instruments installed on surface & underground works 
  • Preparation of monitoring reports including data interpretation and analysis where required
  • Calibration, testing, and maintenance 

The instrumentation consisted of hundreds of geotechnical sensors including:

An automatic Data Acquisition System was installed and commissioned to collect data from the above geotechnical instruments. The data was collected automatically at required intervals. 

Encardio-rite provided a comprehensive monthly monitoring report, combined with geotechnical and geodetic monitoring data on a weekly and monthly basis. Monitoring reports included interpretations of variations observed in instrument data concerning the construction progress in the respective area.

Project DetailsNikachhu Hydropower Project
LocationTrongsa, Bhutan
ClientTangsibji Hydro Energy Limited (ThyE)
ContractorHindustan Construction Co. Ltd.
ConsultantsSMEC
Year2018 till date (2021)