Nikachhu Hydropower Project
Nikachhu Hydropower Project is a run-of-the-river project located between the junction of Nikachhu/Chhunabchhu and Nikachhu/Mangdechhu in Trongsa District, Bhutan. It is located almost 3 km from Chhunabchhu junction downstream.
Dam: 38 m high concrete gravity dam
Head Race Tunnel (HRT) : Diameter 4 m ; Length 12,144 m
PowerHouse: Design discharge hits two Pelton turbines with a capacity of 118 MW. The water is then discharged into the reservoir of Mangdechhu Hydropower Project
The complete instrumentation & monitoring work for the Dam, Power House, and Head race tunnel project was awarded to Encardio-rite. The scope of work included:
- Supply of all instruments
- Installation & monitoring of geotechnical instruments installed on surface & underground works
- Preparation of monitoring reports including data interpretation and analysis where required
- Calibration, testing, and maintenance
The instrumentation consisted of hundreds of geotechnical sensors including:
An automatic Data Acquisition System was installed and commissioned to collect data from the above geotechnical instruments. The data was collected automatically at required intervals.
Encardio-rite provided a comprehensive monthly monitoring report, combined with geotechnical and geodetic monitoring data on a weekly and monthly basis. Monitoring reports included interpretations of variations observed in instrument data concerning the construction progress in the respective area.
Project Details | Nikachhu Hydropower Project |
---|
Location | Trongsa, Bhutan |
Client | Tangsibji Hydro Energy Limited (ThyE) |
Contractor | Hindustan Construction Co. Ltd. |
Consultants | SMEC |
Year | 2018 till date (2021) |