Anthochori Tunnel
Encardio-rite supplied monitoring instruments for the twin bore highway
Anthochori Tunnel, Egnatia Highway, Section 3.2 in Northern Greece. The
tunneling process followed the ATM – Mechanical excavation method and
occasionally the drilling and blasting method. The project was
constructed between 2001-2005. The total length of tunnel is 2 x 673 m,
with cross section 105 m2.