[Case Study] Dubai Metro: Monitoring the Longest Driverless System in the World

The first line (Red) of the Dubai Metro, which covered 10 stations was inaugurated at 9:09:09 pm on 9 September 2009 by Mohammed bin Rashid Al Maktoum, Ruler of Dubai. Since then, the line has been expanded to serve 29 stations, while the green line now serves 20 stations. These two lines were constructed and monitored in two different phases, with each of them with its own set of challenges and difficulties.

In this article, we will be taking an in-depth look into the metro and underground monitoring, as well as the sensors and instruments used.

Let’s start with the basics – the importance of underground tunnel monitoring.

Tunnel Monitoring for Metro

As the metro railway tracks run underground in tunnels, geotechnical monitoring plays an important role in authenticating the stability and strength of the tunnel, evaluating the intensity of the operations involved during construction, and verifying the design. This helps to ensure that there is no risk to life or property, and any unusual shift or tilt can be judged beforehand to address the problem.

The instrumentation of underground tunnels helps us to study the behavior of the tunnel with respect to the rheological behavior of the rock mass. Any changes or shifts in the fault zones, walled sections, inflow, etc. are quickly identified and prevented if need be.

Monitoring and Instrumentation prove to be useful even in the pre-construction phase as the sensors placed in the exploratory tunnels and boreholes done from the surface provide accurate information about the existing ground condition, which in turn helps to make a foolproof design accounting for the ground condition.

Post-construction, geotechnical monitoring helps to keep the entire structure stable, while looking out for signs of natural calamity like an earthquake, etc. This, in turn, assists in planning and optimizing the maintenance schedules.

Encardio Rite provides highly reliable and accurate in-house manufactured sensors that prove to perform even under the harshest conditions. Moreover, its web-based monitoring solutions work to provide long-term safety monitoring of tunnels. These instruments can be installed on the tunnel roof and at selected arrays along the walls of the tunnels to monitor vertical, horizontal, and longitudinal in-tunnel direction deformation components.

Encardio also offers several advanced monitoring technologies which include 3D deformation monitoring, laser scanning, aerial survey, etc. to keep an eye on the structural health of the tunnel and surrounding structure.

 

 

 

 

 

Dubai Metro – A case study

Dubai Metro is the first urban network to run in the Gulf Arab States and is the longest automated driverless system in the world. With the metro running underground in the city center, from the Sheikh Rashid/Sheikh Khalifa Bin Zayed intersection to Salahuddin/Abu Bakr Al Siddique intersection on the Red line and from Garhoud to Oud Metha Road on the Green line, it has provided a safe and swift commute to thousands of workers in the country.

The Green and Red line was the first to be monitored and constructed, which was done in two different phases.

Phase 1 included the Red Line running from Al-Rashidiya to Jebel Ali, a 53km long rail line connecting 26 stations. Out of this, 5.6 km of the line and four stations operated underground. This took place from 2006-2009.

Phase 2, which was the Green Line, constituted 14 stations (18km), out of which 6 (7.9km) of them were underground. This was carried on from 2007-2010.

The underground pre and post-construction work was carried out while ensuring that it wouldn’t affect the buildings in the zone of influence. Encardio Rite and the team laid out a sound and reliable instrumentation and monitoring plan designed to meet the purpose.

| Also Read: Doha Metro Case Study: Monitoring One of The Most Advanced Rail Transit Systems in The World |

Monitoring Solutions & Turnkey Services

Encardio Rite was entrusted with the complete monitoring and surveying solutions for underground stations, tunneling sections, and structures falling within the zone of influence of the Red and Green Lines.

The work of the Red Line started in May 2006, when a team of 20 experienced engineers, team leaders, and project managers were stationed at the place of construction to oversee the accurate execution of the turnkey services as well as assist with the hurdles. The Red Line Phase was successfully completed in 2010.

The Turnkey Services included:

  • Supply of Geotechnical Instruments
  • Installation of the instruments and drilling works for the subsurface instruments
  • Optical Surveying & Monitoring
  • Reporting with evaluation & interpretation – Daily, weekly, and monthly
  • Calibration of data loggers and sensors

Instruments Used in Dubai Metro Monitoring

1. Inclinometer

Inclinometer were used to accurately monitor lateral movement due to excavation and tunneling works. and were installed in the ground, diaphragm walls, behind diaphragm walls, arrays running across tunnel alignments, etc.

2. Standpipe Piezometer

Standpipe Piezometer was installed in monitoring arrays across tunnel alignments, and around the station area to monitor groundwater level.

3. Magnetic Extensometer

These are used to keep an eye on the subsurface settlement which occurs at various depths because of heavy construction practices like excavation and tunneling.

4. Strain Gauges and Load Cells

They are used to measure stress or load during the preloading and loading time of the excavation period as the surrounding soil pressure is subject to change. They are installed in struts.

5. Surface Settlement Points

The surface settlement points are utilized to monitor surface settlement around excavation works and across tunnel alignment. They do so by being installed in soil.

6. Building Settlement Points

Required to monitor settlement within the Zone of Influence (ZOI), they are installed on the buildings and structures.

7. Tilt meters

They are used to monitor the uniaxial or biaxial rotation/angle of buildings and structures tilt that fall within the Zone of Influence. They are placed on walls, supporting frames, floor slabs, etc.

8. Crack Gages

As the name suggests, they are used to notice and measure any change in the crack width that may be induced by construction works. Naturally, they are installed across the existing cracks of buildings and structures that are placed near the construction zone.

Encardio Rite and team provided their dedicated service for almost 4 years. The Monitoring reports gathered during these times were provided which included interpretations of variations observed in data and the factors likely to influence their behaviors like construction, dewatering, third-party activities, etc. The Reports also incorporated progress charts that provided tunnel excavation details with respect to the monitoring data.

This was all about Encardio Rite’s Monitoring and instrumentation services for the Dubai Metro. For more such articles, keep watching this space.

If you have any doubts or questions, feel free to comment below, and we will get back to you.

Got unanswered questions? Ask

Direct To Your Inbox !

Subscribe to our monthly newsletter and get access to the latest industry trends, insights & updates.